Food Distribution & Industrial

Driscoll Foods - Phase II

Project Overview

Second-phase Driscoll Foods plumbing with PVC DWV, copper domestic water with ProPress fittings, stainless grooved piping, floor drains, floor sinks, and trench-drain alternates.

Overview

Driscoll Foods Phase II extended plumbing work in a food-distribution environment where drainage, material selection, washdown conditions, and existing facility operation influenced the scope.

Scope

Affinity's scope included Schedule 40 PVC DWV, copper domestic water with ProPress fittings, Schedule 10 stainless grooved piping, floor drains, floor sinks, and trench-drain alternate coordination.

Coordination

The work was coordinated around food-service durability, field routing, equipment access, floor-drain locations, and work inside a distribution facility.

What This Project Demonstrates

This project supports Affinity's commercial and industrial portfolio by showing phased plumbing work in a facility where systems have to serve daily operation.

Market: Food Distribution & Industrial Location: Wayne, NJ Year: 2020